lrx8988
幼苗
共回答了17个问题采纳率:88.2% 举报
It is on our side received the order of 50 tonnes of walnut No.89 of the contract.Now enclose herewith to sign by the side of a check,please.Through the joint efforts of both sides,we have to bridge the difference between the price reached a deal.Related to you by the letter of credit in favor of the London branch of Bank of China opened to you.The card will be sent to you on time Department.
On the other side of the number of requests to be trying to offer.
1年前
6