jinxing59210
幼苗
共回答了19个问题采纳率:89.5% 举报
The main content of this design is optimization of thermal power plant circulating water system and automatic dosing device design and calculation. The first part is the optimization of thermal power plant circulating water system parts, the overall description of the process and the circulating water system problems. Respectively, from previous years, the circulating water system problems and solutions and the current circulating water system problems and solutions was compared, the separation of their respective advantages and disadvantages of the different, the other a simple exposition of the possibility of future development of circulating water. Content also includes its own in some of the water cycle, including some of the ways to deal with water during selection and processing drug dosing after some of the problems, whether the increased efficiency of the entire unit, the power plant's economic of doing some analysis. The second part is the automatic dosing device design. Including the automatic dosing unit part of the mechanical design and electrical design component. Objective is to automate the dosing device, and the Accuracy of convenient technology.
1年前
1