1. Each batch of product, "Test results table" should be recorded in the project 2. This product is based on the composition of the table with -1, mixing, and must meet the quality specifications table -2.
1.Experiment Result should be taken down in every products. 2.The product is collocated and the mixed according to sheet 1,and should fit in with the requirement in sheet 2.
1.the term be record in thecreate table of test on every group of product 2.this product is made and mixed according the compose from table one and this product must in line with the qualification in table two .