Hi AllHow to avoid the GR reversal after IR.Current flow is PO -> GR -> IR and 102 to reverse GR. since IR posting is completed, 102 posting sould be blocked or warned.How to configure this Please helpThanks
hane_m 1年前 已收到4个回答 举报

木子科技 幼苗

共回答了14个问题采纳率:92.9% 举报

Hi Pheonix / AllI have two issues now. 1. Stores always use use goods receipt ( PO ref ) instead of sub delivery ( mat doc ref). This way the link between GR and IR is not established.2. My finance pe...

1年前

2

mz244 花朵

共回答了25个问题采纳率:88% 举报

Hi man,Many times discussed,,use Tcode:OMBZ, deactivate check box your MT:102. It will work..CheeriosVenkat

1年前

0

我只是冷漠 春芽

共回答了16个问题采纳率:81.3% 举报

You are correct man,,however my assumption is since you are doing LIV based on your GR, so i believe that your GR based I/V verification is in effective from vendor master/info record/If there is contract for source.CheeriosVenkat

1年前

0

devclub 幼苗

共回答了16个问题采纳率:81.3% 举报

Hi AllThe above will not be effective, if the GR based IR is not setup.1. I have used Venkats setting to disable reversal GR after IR2. Before that, need to put in place all the vendor master and PO setting for the GR based IR.Thanks Nagam