英语翻译7 Matters affecting EPC rights7.1 Overlapping tenementsA

英语翻译
7 Matters affecting EPC rights
7.1 Overlapping tenements
An EPC may overlap with various mining and petroleum tenements or applications for tenements held by other parties which will impact on the rights of the EPC holder to undertake exploration.Below is a summary of the regime established under the MRA,PGPSA and GEA to manage competing tenement holders and their interests in the land over which the tenements are granted.
(1) Mining tenements
(a) Granting an EPC:
x05(i) The MRA allows an EPC to be granted over a pre-existing EPM.The
existence of overlapping exploration permits may restrict the future grant of MLs (see paragraph 7.1(1)(c)(i)).
x05An EPC may be granted over the area of a pre-existing ATP.Where an EPC is granted over the area of a pre-existing ATP and an authorised activity for an ATP has already started,an authorised activity for an EPC may not be carried out on the overlapping land if carrying it out adversely affects that carrying out of an authorised activity for the ATP.
x05Where there is a pre-existing ML,MDL,ML application or MDL application over the area of an EPC or EPM application,the area that is the subject of the pre-existing tenement shall be taken to be excluded from the area specified in the EPC or EPM application:
x05in the case of a ML or MDL - for so long as the area remains the subject of the pre-existing ML or MDL; and
x05in the case of an ML application or MDL application - for so long as the application is not rejected or abandoned or,if a MDL or ML is granted,for so long as the land remains subject to that granted MDL or ML,
except where the Minister,in exceptional circumstances in the Minister's absolute discretion otherwise determines.
x05Generally,upon termination of the MDL,ML or rejection or abandonment of the MDL Application or ML Application,the excluded land shall become part of the EPC.
x05(v) If there are two competing applications for exploration permits in relation to the same mineral,priority is given to the application lodged at an earlier date.If applications are lodged on the same day,they take the priority the Minister decides,after considering the relative merits of each application.
(b) Granting an MDL:
x05(i) Where an MDL application is made,an area covered by a pre-existing ML or included in an earlier application for an ML is taken to be excluded from the area the subject of the MDL application.However,the area is excluded from the MDL:
x05In the case of an ML - only while it is covered by an existing ML; and
x05In the case of an MLA - until the area is no longer the subject of the MLA or the MLA is abandoned or rejected.
x05Competing applications for the grant of MDLs made in respect of or including the same area shall take priority according to the Minister's determination.
x05If:
x05the Mining Registrar accepts lodgement of an application for an MDL for particular land; and
weifanzh 1年前 已收到1个回答 举报

luoyejx 花朵

共回答了19个问题采纳率:94.7% 举报

7影响总承包权
7.1个重叠的公寓
一个项目可能重叠,各种采矿和石油资源或申请房屋持有的其他各方将影响的权利的持有人进行了探索.下面是一个简要的政权下的成像,pgpsa和齿轮管理竞争的房屋持有人及其利益的土地上的房屋是理所当然的.
(1)开采物业
(一)授予合同:
(我)的成像允许合同被授予超过一个预先存在的人.本
存在重叠的勘探许可证可能限制未来的大联盟(见第7.1段(1)(三)(一)).
一个项目可能被授予对该地区的一个已存在的三磷酸腺苷.在消失模铸造是理所当然的面积超过一个预先存在的三磷酸腺苷和三磷酸腺苷授权活动已经开始,一个授权活动的合同可能无法进行重叠土地如果实施产生不利影响,开展授权活动的三磷酸腺苷.
那里有一个预先存在的毫升,军事分界线,应用程序或军事分界线的应用领域的一个项目或企业应用,该地区的主题是现有的租户须排除在规定的区域或企业的应用:
在一个毫升或军事分界线——只要区的主题仍然是原有的毫升或军事分界线;和
在一个应用程序或应用程序只要应用程序没有抛弃或,如果一个公司或毫升是理所当然的,只要土地仍然受到给予军事分界线或毫升,
除本部长,在特殊情况下在牧师的绝对自由裁量另有决定.
一般来说,在终止时的军事分界线,毫升或拒绝或放弃军事分界线的应用程序或应用程序,排除地成为一部分的消失模铸造.
(五)如果有两家申请勘查许可证与同一种矿物,优先考虑的是应用在较早的日期.如果申请递交的同一天,他们优先考虑的部长决定,在考虑的相对优点每个应用.
(二)授予一个军事分界线:
(我)在一个军事分界线的应用,覆盖的区域存在毫升或包括在早期申请一毫升是被排除在该地区受到军事分界线的应用.然而,该地区被排除在军事分界线:
在一个毫升-仅当它是一个覆盖现有毫升;和
在一个工作重点-直到地区不再是问题的重点或重点是被遗弃或拒绝.
抵触申请授予的关系在尊重或包括同一地区应优先根据部长的测定.
如果:
采矿登记受理提交申请的军事分界线的特定土地;及

1年前

8
可能相似的问题
Copyright © 2024 YULUCN.COM - 雨露学习互助 - 16 q. 0.024 s. - webmaster@yulucn.com