The Layer Forming Transfer is driven by an AC motor through a gearbox,supplied by a frequency
converter.During the working operations the motor runs only in the forward direction.For maintenance purpose or cobble clearing both directions of rotation are required with an inching speed of 5 % of the max speed.
Transport speed is set by the operator or determined by rolling schedule.The speed of the forming
chain transfer must always be set in order to avoiding material overlapping (speed can be different
from previous chain transfer in order to compact or separate bars from one transfer to the other).
The main drive runs frequency controlled without a sensor speed-feedback,when the length of the
product requires that the section move together,the synchronized movement will be provided by the automation control system.
The transfer is divided in sections.Each section is 12 m long.
Automatic sequence is as follows:
1.When the stacker area is placed in automatic,the layer forming chain transfer will start running in forward direction.
2.The layer forming chain transfer drive is commanded to stop if any of the following conditions
are detected:
Stop condition 1:
- Layer present at stop #1
- Layer present at stop #2
- Layer separator is up
- Layer present at stop #3 OR layer on deposit magnets
Stop condition 2:
- No material is detected at any of the following listed locations AND after a time-delay (time
based on length of chain transfer section and speed of transfer).
- Previouse chains transfer exit
- Layer forming chains transfer entry
- Layer forming separator zone
- Between stops #1 and #2
- Stop #2
- Between stops #2 and #3
- Stop #3
3.Cycle complete.
YBenimaru 1年前 已收到1个回答 举报

小楼听夜雨0401 幼苗

共回答了19个问题采纳率:94.7% 举报

形成的层转移一交流电动机通过一个齿轮箱驾驶,被一台频率变换器提供.在工序期间电动机只朝着向前的方向运转.为维修目的或者清除旋转的两个方向的圆石被有最大的速度的百分之5的渐进速度要求.运输速度因为那些操作者确定或者被以滚时间表确定.根形成的链子的速度转移总必须为了避免材料重叠确定 (速度可能,不同于以前链子转移为了紧密或者一到另一个的转移).当这种产品的长度要求部分一同移动时,主要运动运转没有一个传感器速度反馈而控制的频率,协调的运动 将由自动化控制系统提供.转移被在部分里分.每个部分都是12米长.自动顺序如下:1.那些堆垛工地区被安置用自动,形成链子的那些层转移开始在向前方向内跑将.2.形成链子转移的那些层驾驶停止任何下列状况被识别:停止状态1:- 层在停车站提出#1 - 层在停车站提出#2 - 层分离器上升 - 出席停车站#3或者层在存款磁铁上的层停止状态2:- 列举位置,没有材料被在任何如下内容发现,和在时间延迟之后 (基于链子的长度的时间转移部分和转移的速度).-Previouse 链子转移出口 - 层形成 链子转移入口 - 层形成分离器区域 - 在停车站#1 和#2-停止#2-之间在停车站#2 和#3之间 - 停止#3 3.循环完成.

1年前

7
可能相似的问题
Copyright © 2024 YULUCN.COM - 雨露学习互助 - 16 q. 1.429 s. - webmaster@yulucn.com