In our next period, we need to test the entire production process and collect the necessary data from the equipment with which to check all the functions used for testing the system. However, the current equipment cannot be put to use yet. We hope that we can get a timetable for the electricity supply to run the equipment, as a result of which we can arrange our testing time.