英语翻译One-Off ProjectsThe following three tasks are required a

英语翻译
One-Off Projects
The following three tasks are required at the beginning of the Network Development project.
Facility Design and Construction Guide
Qoros will provide a Dealership concept design and facility standards.
This output needs to be developed into a Facility Design and Construction Guide that practically guides Dealer architects and general contractors to meet Qoros standards.The Guide should be at the most comprehensive level and to include:
A model Dealership design
Size guides based on Dealership capacity levels
Appropriate engineering specifications
Layout guidelines to maximise Qoros brand compliance,operational efficiency,health and safety
The Guide must be made available for distribution via electronic medium and hosted on a Qoros / TTi website for download.
Facility Component Sourcing
This activity relates to sourcing of brand-critical Dealership components,such as exterior cladding,furniture and internal finishes.
Qoros will provide concept designs for all required components.It excludes technical / functional equipment for Workshop,Parts storage,Body Shop etc.
Source suppliers for each component,optimising cost,quality and reliability
Ensure finished product conforms with Qoros design requirements and obtain sign off on prototypes by Qoros architect
Ensure product durability,warranty and replacement process
Negotiate bulk discounts based on projected total volume
Create and maintain an online catalogue of all components,for use by Dealers and Dealer contractors
Facility CI Signage Sourcing
Qoros will provide concept designs for all required signage components.
Source suppliers,optimising cost,quality and reliability
Ensure finished product conforms to Qoros design requirements and obtain sign off on prototypes by Qoros architect.This includes:
Foundations and wall mountings
Guidelines for cleaning and maintenance
Ensure product durability,warranty and replacement process
Negotiate bulk discounts based on projected total volumeCreate and maintain an online signage catalogue,for use by Dealers and contractors
饿滚 1年前 已收到3个回答 举报

day666 幼苗

共回答了12个问题采纳率:91.7% 举报

一次性项目
以下三个任务需要在开始的网络发展项目.
设施的设计和施工指南
qoros将提供一个经销商的概念设计和设施标准.
这个输出需要发展成一个设施的设计和施工指导,切实引导经销商建筑师和承包商满足qoros标准.该指南应该是最全面的水平,包括:
一种新型经销商设计
大小指南根据经销商能力水平
适当的工程规格
布局指导方针最大限度地遵守qoros品牌,运营效率,健康和安全
该指南提供了必须的分布通过电子媒介和托管在qoros /我的网站下载.
设备采购
这项活动涉及采购brand-critical经销商组成,如外部包层,家具和内部装饰.
qoros将提供所需的所有组成部分的概念设计.它不包括技术/功能设备车间,零件储存,车身车间等.
供应商的每个组件,优化成本,质量和可靠性
确保成品符合设计要求并获得qoros签下的原型qoros建筑师
确保产品耐用,保修和更换过程
谈判批量折扣的基础上预测的总体积
创造并维持一个网上目录的所有组件,使用由经销商和经销商承包商
词标志设施采购
qoros将提供概念设计所需的所有标志元件.
供应商,优化成本,质量和可靠性
确保成品符合设计要求并获得qoros签下的原型qoros建筑师.这包括:
基础和壁架
准则的清洗和维护
确保产品耐用,保修和更换过程
谈判批量折扣的基础上,预计总volumecreate和维护在线标识目录,使用由经销商和承包商

1年前

6

ga16028 幼苗

共回答了23个问题 举报

一次性的项目需要以下三个任务开始时的网络开发项目。设施的设计和建造指南将提供一个经销商Qoros概念设计和设施年代……

1年前

2

判定 幼苗

共回答了95个问题 举报

一次性的项目

以下三个任务都需要在网络开发项目的开始。


设施的设计和建造指南

Qoros将提供一个经销商概念设计和设备的标准。

这个输出需要发展成一个设施的设计和建造指南,实际上指导经销商建筑师和总承包商来满足Qoros标准。导游应该在最全面的水平,包括:
一个模型经销商设计
大小指南基于经...