In-process inspection / deny stock receipt

In-process inspection / deny stock receipt
Hi,we have the following problem :We use In-process inspection,but it's possible to do a stock receiptwithout confimation of operation in which the inspection should take place.Question :How can I prevent movement to stock while not all inspections we done Best regards toz
stockxyz 1年前 已收到1个回答 举报

cxd306 幼苗

共回答了11个问题采纳率:90.9% 举报

HiI am not clear on your requirement i.e whether you want operation to be confirmed before GR or results to brecorded before GR.The first problem should be relatively easy to solve .Do not allow Goods receipt against process order for system status PCNF.You can do this via BS22.The 2nd problem is tricky with inspection type 03.It will involve using different order types for products having quality check .Also you will have to play around with order user status and setting/deleting them with follow up action on UD to control GRYou can use different production scheduler to default different order type for different material as per need.查看原帖

1年前

10
可能相似的问题
Copyright © 2024 YULUCN.COM - 雨露学习互助 - 16 q. 0.014 s. - webmaster@yulucn.com