英语翻译Means 20 April,2012,provided that if it is not a Busines

英语翻译
Means 20 April,2012,provided that if it is not a Business Day (and a Scheduled Trading Day,if physical settlement),the following day which is a Business Day (and a Scheduled Trading Day,if physical settlement),provided further that if for
whatever reason (including due to the occurrence of a Market Disruption Event)the Determination Date is postponed to a day
falling on or after 2 Business Days prior to the originally scheduled Maturity Date,the Maturity Date shall be postponed to the day falling 2 days which is a Business Day (and a Scheduled Trading Day,if physical settlement)following the postponed Determination Date.
heixin3113 1年前 已收到4个回答 举报

chenzlong 幼苗

共回答了16个问题采纳率:81.3% 举报

就是说假定2012年4月20,这天为非营业日(或是实物交易的预定交易日),接下来一天是营业日(或是实物交易的预定交易日),再假定如果由于任何原因(包括由于发生市场干扰事件),最后交易日期被推迟到原定到期日期之前的2个营业日或更晚,到期日期将顺延至推迟后的交易日期的两天之后的一个营业日(或是实物交易的预定交易日).

1年前

1

arn_2007 幼苗

共回答了5个问题 举报

意味着2012年4月20日,但如果它不是一个营业日(与一个预定交易日,如果实物交割),下面的营业日,(和一个预定交易日,如果实物交割),另外还规定,如果出于什么原因(包括由于发生干扰市场态势事件)则测定日期被推迟一天,落在后2个营业日前原定到期日期,到期日期顺延至下一天2天这是一个营业日(和一个预定交易日,如果实物交割日期推迟)后测定。...

1年前

1

七千越 幼苗

共回答了16个问题采纳率:87.5% 举报

2012年4月20,但如果它不是一个营业日(与一个预定交易日,如果物理沉降),接下来的营业日,(和一个预定交易日,如果物理沉降),还规定,如果什么原因(包括由于发生干扰市场事件)测定日期被推迟一天落在后2个营业日前原定到期日期,到期日期顺延至下一天2天这是一个营业日(和一个预定交易日,如果实物交割日期推迟)后测定。...

1年前

0

liuzz22222 幼苗

共回答了15个问题 举报

意味着4月20日,2012年,如果不是营业日(预定交易日,如果实物交割),这是一个营业日(预定交易日,如果实物交割)翌日,提供了进一步的 如果为 无论何种原因(包括由于市场中断事件的发生)的测定日期推迟一天 到期日下降2个营业日或之后原定的到期日之前,应推迟一天下降2天,这是推迟测定日期后一个营业日(预定交易日,如果实物交割)。...

1年前

0
可能相似的问题
Copyright © 2024 YULUCN.COM - 雨露学习互助 - 19 q. 0.023 s. - webmaster@yulucn.com