英语翻译在建筑物修建之前,对建筑物进行地质勘察,做好稳定性评价的相关工作,这样可以为建筑物的安全建设及安全使用提供一个良

英语翻译
在建筑物修建之前,对建筑物进行地质勘察,做好稳定性评价的相关工作,这样可以为建筑物的安全建设及安全使用提供一个良好的保证.本文结合相应的勘察资料和历史地震资料对华润微山湖电厂建筑场地稳定性进行分析,对该场地的建厂适宜性做出评价,并对不适宜建厂的相关地质问题提出治理意见.
在大地构造上,该工程场地位于华北地台的东南部,鲁西断块区和徐淮断块区的过渡区,在鲁西断块区一侧.首先对场地的区域地质构造和地震活动性进行分析,进而评价地块的稳定性.另外,结合对场地地震效应、地基的抗震性能以及其它不良地质现象的分析,给出建厂适宜性的最终评价和建议.
烟_灭 1年前 已收到1个回答 举报

莱茵之星 春芽

共回答了18个问题采纳率:83.3% 举报

吃饭都耽搁了,一定要采纳为满意答案哈.有意见可以讨论.
Before constraction of a building , the work of relating geological survey and stability evaluation would be conducted to provide a good guarantee such as safety of construction and safety in use. In this paper, Huarun Weishan Lake power plant construction site stability analysis was done with both of survey data and historical earthquake data. The evaluation of construction site suitability was made. The corrective action on related geological issues which unsuitable for the construction was proposed as well.
From the view of techonics, the project site is located in the southeast of North China platform, in the transition zone of Luxi fault block zone and Xuhuai faulted block zone, but near the side of Luxi fault block area. First of all, site location, geological structure and seismic activity were analyzed, and then eluvated the stability of blocks. In addition, with on site seismic effect, its seismic performance and other adverse geological phenomenon analysis, provided the construction suitability evaluation and proposal at final.

1年前

9
可能相似的问题
Copyright © 2024 YULUCN.COM - 雨露学习互助 - 16 q. 1.754 s. - webmaster@yulucn.com