英语翻译the cavity and or core block can be removed from the par

英语翻译
the cavity and or core block can be removed from the parting line of the tool without removing the mold from the press.To accomplish this it requires less clearance in the support plate so that the ejector pins retain alignment once the cavity block is removed.The ejector pin holes will require a gradual transition from a clearance diameter in the rear of the block to a tight fit at the front of the block.This is most often accomplished with a double pass wire edm process,one pass cuts the taper for clearance and the second cut finishes the fit diameter for a length of 2-3 times the ejector pin diameter.The cavity and core blocks also require bolts that are accessible from the parting line and usually also have a jack screw thread machined into the bolt clearance diameter so that smaller bolts can be used to jack the cavity block out of a pocket.It is often common for this type of construction to also include a wedge block to force a row of cavities together before the final tightening of the mounting bolts.
客户要做模具,这一点很重要的,怕给翻译错了.
huangze309 1年前 已收到1个回答 举报

hwee1801119 花朵

共回答了17个问题采纳率:94.1% 举报

上,下模在压力机要能够分开(抜模),因此,要求托板间隙要小,上模一旦拔出,定位销要成一直线,定位销要有锥度,上模入槽前与销孔达到适度(滑动)配合,这通常用电火花分两次加工,先加工锥度,再加工适度配合部分,其长度为定位销直径的2--3倍,为了便于抜模,上下模要分别用螺钉固定住,为了防止底模镶块脱落,要加骑缝丝,这种结构的模具在紧固托板螺钉前要用楔块把底模挤成一排,
请自己根据图纸斟酌一下,看我的翻译是否有用,我以前只做过简单模具,

1年前

1
可能相似的问题
Copyright © 2024 YULUCN.COM - 雨露学习互助 - 16 q. 0.256 s. - webmaster@yulucn.com