替女儿征个名
幼苗
共回答了17个问题采纳率:88.2% 举报
由于我们检测部门发现新model 在大货生产的时候出现了点问题,为了保证品质质量,我们大约花了半周的时间来解决这个问题.
As problems were found by our inspection dept during the bulky cargos production of the new model, it took us about half a week to work out a solution for the sake of product quality.
您好,原文翻译如上供参考,不明白可继续提问.
若回答对您有所帮助,请点击本页面中的“选为满意回答”按钮,谢谢.
1年前
追问
7
EVIL涯
举报
我想改成 为了保证产品质量,我们推迟了大约半周的生产日期,货物在这个星期之内ready。
举报
替女儿征个名
为了保证产品质量,我们推迟了大约半周的生产日期,货物在这个星期之内ready For the sake of product quality, we have delayed the manufacturing date by about half a week. The cargos will be ready within/by this week.