英语翻译成套的大型或特大型设备占工程造价比例较高,工程一上场急需购置,一次付款难度很大,怎么办?可以通过金融机构,用工程

英语翻译
成套的大型或特大型设备占工程造价比例较高,工程一上场急需购置,一次付款难度很大,怎么办?可以通过金融机构,用工程造价作抵押,采用融资租赁形式;或从生产厂家直接租用,采用以租代售、分期付款形式,厂家还可回收旧设备,解决设备配置难题.通过互联网公布需求和闲置材料设备信息;采用合租机械设备形式,做好工序衔接,提高设备利用率,降低租赁成本和运费;加强设备维护和保养,提高设备完好率,亦可降低工程成本.
qianlj2006 1年前 已收到1个回答 举报

zydxn 幼苗

共回答了15个问题采纳率:93.3% 举报

The complete equipment of large or oversize project cost ratio is higher, the urgent need to purchase a project, once payment is very difficult? Through financial institutions may, by using engineering cost, lease financing form, Directly from the manufacturer or rent, used to rent the consignee, the installment, still can form recycling old equipment, equipment configuration problems. Through the Internet published materials requirements and idle equipment information, By sharing machinery and equipment, process, to improve equipment utilization, reduce cost and freight lease, Strengthen and improve equipment maintenance and maintenance of equipment, can reduce the cost for the project pipe.

1年前

2
可能相似的问题
Copyright © 2024 YULUCN.COM - 雨露学习互助 - 16 q. 0.016 s. - webmaster@yulucn.com