zydxn
幼苗
共回答了15个问题采纳率:93.3% 举报
The complete equipment of large or oversize project cost ratio is higher, the urgent need to purchase a project, once payment is very difficult? Through financial institutions may, by using engineering cost, lease financing form, Directly from the manufacturer or rent, used to rent the consignee, the installment, still can form recycling old equipment, equipment configuration problems. Through the Internet published materials requirements and idle equipment information, By sharing machinery and equipment, process, to improve equipment utilization, reduce cost and freight lease, Strengthen and improve equipment maintenance and maintenance of equipment, can reduce the cost for the project pipe.
1年前
2