哪位工程管理专业英语的高手帮我翻译下这篇文章,非常感谢。 As with cost control, the most important decisions regarding the quality of a completed facility are made during the design and planning stages rather than during construction. It is during these preliminary stages that component configurations, material specifications and functional performance are decided. Quality control during construction consists largely of insuring conformance to these original design and planning decisions.
Classmates, good morning. I want to talk about a good friend at time of my Senior Three today. She and grow hair,big eyes, small mouth. She sits behind me, there is any question that is always asked m...