哪位英语专业或者懂得能来帮我翻译一下下面这段文章,道路桥梁专业的专业英语翻译成中文,还会加分的!

哪位英语专业或者懂得能来帮我翻译一下下面这段文章,道路桥梁专业的专业英语翻译成中文,还会加分的!
4 Shields can be steered by varying the thrust of the jacks from left side to right side or from top to bottom, thus varying the tunnel direction left or right or up or down. The jacks shove against the tunnel lining for each forward shove. The cycle of operation is forward shove ,line, muck, and then another forward shove. The shield used about 1955 on the third tube of the Lincoln Tunnel in New York City was 18 feet (5.5meters) long and 31.5 feet (9.6meters) in diameter. It was moved ahead 32 inches (81.2cm) per shove, permitting the fabrication of a 32-inch support ring behind it.
5 Sunken-tube tunnels. Where the riverbed subsoil is firm and the river current is not excessive,shore-fabricated tunnel sections can be towed over a prepared trench in the river bottom and suck into place to form a underwater tunnel. The first major prefabricated,floated,and sunken tunnel was the Detroit River Tunnel between Detroit and Windsor,Ontario.This vehicular tunnel was built in 1906-1910. The next important vehicular tunnel built by this method was the Posey Tube ,which was completed in 1928.It runs under a saltwater arm between Oakland and Alameda,Calif.Since then many other sunken-tube tunnels have been built under rivers and saltwater bodies,notbly the Transbay Tunnel between Oakland and San Francisco.
6 The cylindrical tunnel sections usually are made of steel in an onshore yard,Each section is about 300 feet (90 meters) long and 28 to 48 feet (8,5-14.6 meters) in diameter. After the openings at each end of a sevtion are closed with steel bulkheads, the tube is ready for launching in the manner of a ship . Once in the water, a section is ballasted with concrete until a minimum buoyancy is attained. Then the section is to the tunnel site. Before the arrival of the section,dredges and underwater excavators dig a trench to the proper depth of the tunnel.When the tube section is positioned precisely over its final location,additional concrete is added until the section sinks into prepared trench.All sections of the tunnel are transported and sunk in place in the same way.
对骚扰恐惧 1年前 已收到3个回答 举报

bocc22366 花朵

共回答了17个问题采纳率:100% 举报

去google找

1年前

1

无人值守 幼苗

共回答了17个问题采纳率:88.2% 举报

4盾牌可以通过改变波束千斤顶推力的从左至右侧面或从上到下,从而改变了隧道方向向左或向右或上升或下降。杰克把对隧道衬砌每向前推。这个循环的运行是向前推,线条,粪,然后再向前推。使用了大约1955年盾的第三管在纽约林肯隧道是18英尺(5.5meters 315英尺)长,直径(9.6meters)。这是移动到前方32英寸(...

1年前

1

paqeb 幼苗

共回答了21个问题采纳率:85.7% 举报

4盾牌可以通过改变波束千斤顶推力的从左至右侧面或从上到下,从而改变了隧道方向向左或向右或上升或下降。杰克把对隧道衬砌每向前推。这个循环的运行是向前推,线条,粪,然后再向前推。使用了大约1955年盾的第三管在纽约林肯隧道是18英尺(5.5meters 315英尺)长,直径(9.6meters)。这是32英寸(81.2cm向前推,众说纷纭,每个制作出32英寸支撑环在它后面。
5 Sunken-...

1年前

1
可能相似的问题
Copyright © 2024 YULUCN.COM - 雨露学习互助 - 19 q. 0.135 s. - webmaster@yulucn.com