英语翻译The quantities given in the Bill of Quantities are estim

英语翻译
The quantities given in the Bill of Quantities are estimated and provisional,and are given to provide a common basis for bidding.The basis of payment will be the actual quantities of work ordered and carried out,as measured by the Contractor and verified by the Engineer and valued at the rates and prices bid in the priced Bill of Quantities,where applicable,and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract.The rates and prices of major materials (steel pipes,electromagnetic meters and valves) will be paid upon delivered to the site according to the related items in the Technical Specifications.
===================
不好意思.就是以上几句了,快回答,过时不候!
旧居寻故人 1年前 已收到1个回答 举报

catalina110 幼苗

共回答了25个问题采纳率:92% 举报

工程量清单中列出的工程只是估计的、临时的数量.之所以给出这些信息是为了给投标一个共同的基础.支付的基础则是实际安排的和完成的工作.由承包人来计算、工程师进行核实,并且在可以的时候按照工程量清单中的费用和价格计算.如不能的情况下则由工程师按照合同的条款进行修改.主要材料(钢管、点此仪表和真空管)的价格根据技术要求交付到施工地点后进行付费.

1年前

1
可能相似的问题
Copyright © 2024 YULUCN.COM - 雨露学习互助 - 16 q. 0.027 s. - webmaster@yulucn.com