The 6.35X6.35 products are still in production. The earliest delivery date would be Sptember 15. These products are very easy to deform. We need to take them to the process factory to be re-processed.
The product of 6.35x6.35 is being produced. Now the best time of delivery is Sep 15th. As the product is easy to be out of shape, we need to proceed in the factory.
Item with the size 6.35x6.35 is still under production. The very soon delivery dat is 15th Sep. As its shape is easily changed, so it need to be taken to the factory to be improved.
6.35x6.35 this product is still in production, at present we are the fastest delivery time is 9.15. Products are easy to deformation, we need to get to the processing plant
6.35x6.35 model is still under production, delivery date can be as early as 9.15, because the product is easy to twist, we need to work on it in the factory.
This product is being produced.The fastest delivey date is 15th, Sep. As you know, products are easliy deformed, so they need to be processed in factory.