C) MOISTUREIf free moisture loss at 105 degrees centigrade a

C) MOISTURE
If free moisture loss at 105 degrees centigrade as finally determined pursuant to the provisions of clause 9 exceeds the guaranteed maximum referred to in clause 3,seller shall pay buyer full actual freight applicable to moisture over 8% for fines.
CLAUSE 7 PAYMENT
Buyer shall open within 5 working days after signing the contract,a transferable,irrevocable and confirmed non-operative Letter of Credit with first class international China bank through Hong Kong Shanghai Banking Corporation in favor of Seller for an amount in US Dollar sufficient to cover 100% (one hundred percent) of the shipment value.
Within Five (5) working days upon receiving the non-operative L/C,the seller shall provide 2% performance guarantee (P/ B) of 100% L/C value in favor of buyer via the mutually accepted bank channel as the guarantee of shipment.The L/C shall then become operative on submission of the performance guarantee.After the execution of the contract,the PG shall become null and void and shall be returned to seller within 15 banking days.
A) PROVISIONAL PAYMENT
The said L/C shall be payable by opening bank against Seller’s sight draft for the amount of 98% (ninety eight percent) of the shipment value accompanied by the documents as stipulated in clause 7.The weight certificate issued by Certifying Agency by survey of ship’s draft together with the certificate of Analysis of sample and of the percentage of free moisture loss at 105 degree centigrade issued by Certifying Agency shall be the basis for seller’s provisional invoice.
A.1 Certifying Agency:
It is preferred by the buyer to use CCIC as the certifying agency for certification of weight and analysis,If CCIC is unavailable to attend the inspection at the time of loading at loading port,then the seller is authorized to carryout the analysis and weight certification by SGS INDIA or SK MITRA INDIA,at the sellers cost,which shall be the basis for the sellers provisional invoice
B) FINAL PAYMENT
The balance due to the Seller after provisional payment shall be made by telegraphic transfer against seller’s final invoice in duplicates delivered directly to the Buyer.This invoice is to be based on CIQ certificate as provided in clause 8 and 9 issued within 45 days from the date of completion of discharging at the discharging port.If umpire analysis is required,payment adjustment arising from this will be made when the umpire’s certificate is available.In case analysis is not carried out at the discharge port within 45 days from the days from the date of completion of discharging,the load port result shall form the basis for final invoice.
The LC should contain the following terms and conditions:
I) The L/C shall allow for 10% more or less in value and quantity.
II) Documents to be presented within 15 days from B/L date.
V) The L/C shall incorporate the following:
- Transshipment not allowed
- Partial Shipment Allowed
zhouhu09 1年前 已收到1个回答 举报

wwbhaijing 幼苗

共回答了27个问题采纳率:96.3% 举报

C) 湿气 如果自由湿气损失在105 摄氏度依照最后被确定寻求供应条目9 超出保证的最大值提到在条目3,卖主将支付买家充分的实际货物可适用对湿气8% 罚款.条目7 付款 买家将打开在5 个工作日内在签署合同,一个可转移,一成不变和被证实的non-operative 信用证以后与头等国际中国银行通过香港上海Banking Corporation 倾向于卖主为数额以美元充足盖100% (百分之一百) 发货价值.在五(5) 工作日内在接受non-operative L/C,卖主将提供2% 履行合同保证人(P/ B) 100% L/C 价值倾向于买家通过相互被接受的银行渠道作为发货保证.L/C 然后将变得有效在履行合同保证人的提议.在合同以后的施行,页将变得除消并作废,将返回到卖主在15 开户的天之内.A) 临时付款 前述L/C 依照被规定将是付得起的由开头银行反对卖主的视域草稿为相当数量98% (九十百分之八) 发货价值由文件陪同在条目7 .重量证明发布了由证明代办处由船的草稿勘测与化验证明对样品的一起并且自由湿气损失的百分比在105 摄氏度由证明发布代办处将是为卖主的临时发货票的依据.A.1 证明的代办处:它由买家更喜欢使用CCIC 作为证明的代办处为重量的证明并且分析,如果CCIC 是无法获得的出席检查在装载之时在装货港口,卖主然后被批准对carryout 分析和重量证明由SGS 印度或SK MITRA 印度,在卖主费用,将是为卖主临时发货票的依据 B) 最后的付款 到期余额对卖主在临时付款将由暂收款付反对卖主的最后的发货票在复制品被交付直接地对买家之后.这张发货票将根据CIQ 证明如所提供在条目8 和9 被发布在45 天之内从释放的完成日期在释放的口岸.如果审判员分析必需,付款调整出现从这将做当审判员的证明是可利用的.如果分析不被执行在放电口岸在45 天之内从天从释放的完成日期,装载口岸结果将形成为最后的发货票的依据.LC 应该包含以下期限和条件:I) L/C 将考虑到10% 或多或少在价值和数量.II) 文件被提出在15 天之内从B/L 日期.V) L/C 将合并以下:- 转船没允许 - 部份发货允许

1年前

1
可能相似的问题
Copyright © 2024 YULUCN.COM - 雨露学习互助 - 16 q. 0.022 s. - webmaster@yulucn.com