This project contract for 190204608 yuan, is the amount of "five longitudinal, six horizontal, seven line" highway network "longitudinal and three" important component. This contract section full-length 12.1 km (starting point for pile K0 +.000, no BDC K12 + 100) pile number. A bridge across the seven 1519m, among them, aggregate long bridge, respectively is 5 tombs ZhouGuWan bridge (singles 140 x 2) m, squeezed river bridge (singles 420 x 2) m, TangGuLou bridge (240 x 2) singles WangGuWan bridge (m, singles 540 x 2) m, TangGu pounds bridge (singles 160 x 2) m, two medium-sized, respectively, western medium-sized ZhangDian hexi liuheyuan TangGuLou bridge, which medium-sized WangGuWan bridge for 30 meters with prestressed concrete continuous beam, others are T 20 meters prestressed concrete hollow slab; Farm machinery overpass 5 block; Prefabrication 24m 312 chips. Above beam tablet Culvert 29 seats, the channel 15 seats, including farm machinery channel 8 saddles, pedestrian channel 2 seat, car channel 5 block; Tunnel ZhouGuWan tunnel, namely two multi-arch tunnel, starting point, K0 + 465 pile number BDC K0 + 935 pile, tunnel, net long 470 meters; Fall in mountain tunnel 1 seat for separate tunnel, tunnel net long's 15 meters.
1年前
2