Not only delay the construction and engineering caused not due to the loss and waste, the impact engineering economic and social benefits. Thus the construction before the accident prevention measures must be taken to reduce accidents is very important. Therefore, it is necessary for specific engineering, geological conditions, discusses the deep foundation pit cast-in-place pile construction process and quality control method, in order to ensure the engineering quality.